NAVY SEAPORTe

Home     Contacts     Team Members     Task Orders     Experience     Quality Assurance

 Experience

CONTRACTS

TOC
BEST-IN-CLASS
PNNL
SRS
EVMS
YUCCA
SLAC
NREL
LOGCAP
WRPS
MSC
TANK OPERATIONS CONTRACT COST ESTIMATE
The Hanford Tank Operations Contract (TOC) is a $7.1 billion contract and is part of the Department of Energy’s Hanford Central Plateau acquisition strategy, which calls for three new cleanup contracts in 2008 at the Site covering mission support, tank farm operations and closure, and waste and facility disposition on the Central Plateau. The scope of the TOC includes base operations of the tanks, analytical laboratory support, single-shell tank retrieval and closure, Waste Treatment Plant support, and supplemental treatment. Washington River Protection Solutions also will manage the pension and welfare plans for incumbent and legacy tank farms employees. Hanford’s tank farms contain 53 million gallons of residual radioactive and chemical waste that resulted from more than three decades of plutonium production. The waste is stored in 177 large aging underground tanks.

Synergistics was responsible for supporting all aspects of cost estimate development for the proposal, including documentation, training, implementation, and execution of an activity-based cost estimating system. This process provided the basis for price reasonableness and realism for the $7.1 billion proposal cost estimate. The proposal cost volume exceeded 3,000 pages and included company-specific technical approaches to various work breakdown structures (WBS) requiring detailed activity-based, parametric, and final design cost estimates, and basis of estimates. This billion dollar estimate had hundreds of resources with varying labor rates, classifications, and complex burdening structures. The estimate used several different types of software, including MCACES II (MII), Primavera, Microsoft Access, Excel, and Word. This cost estimating effort demonstrated that Synergistics has the estimating and programming capability needed to quickly and efficiently mass manipulate billions of dollars of information in MII from a pricing, integration, and traceability standpoint with the highest quality of data integrity.

Project Value: $7,100,000,000

Tank Operations Contract Cost Estimate
 53 Million Gal-lons Radioactive and Chemical Waste  177 Underground Storage Tanks  1,130 FTE  3000+ Pages  10 Years  $7 Billion

TOP

BEST-IN-CLASS, PROJECT MANAGEMENT CONTRACT
This project involves providing risk analyses for the Department of Energy office supporting oversight of multiple Hanford Site projects valued at greater than $1 billion. This effort includes development of risk registers and models and applying Monte Carlo simulations to risk models to determine probable lifecycle schedules and costs at different confidence intervals. Project contingency is calculated as part of this effort, and ongoing risk monitoring and reporting is performed. This work is performed under subcontract to Project Time & Cost, Inc. on a task order issued and managed by the Huntington District U.S. Army Corps of Engineers in support of the DOE Environmental Management (EM) Best-in-Class Project Management effort. Two letters of commendation have been received in appreciation of the key role Synergistics has performed to-date on this task.

Additional tasks in support of this work include reviewing and commenting on draft DOE-EM headquarters (HQ) guidance documents related to risk management, and converting HQ guidance and policy into DOE Richland Operations Office (DOE-RL) guidance documents. Synergistics has also worked closely with Pacific Northwest National Laboratory to aid in the design of software that assists in the performance of risk management tasks at DOE-RL.

Best-in-Class, Project Management Contract
 Risk Management and Analysis Contract
 Application of risk models on multiple projects at the DOE Hanford site valued at more than $1 bil-lion dollars

TOP
PACIFIC NORTHWEST NATIONAL LABORATORY EARNED VALUE MANAGEMENT SYSTEM DEVELOPMENT
Battelle Memorial Institute operates the Department of Energy’s Pacific Northwest National Laboratory (PNNL), which is a premier research and development laboratory with a strong background in atmospheric science and global climate change research. Battelle has operated the laboratory since 1965 and won a multitude of awards for work performed at the laboratory.

Synergistics designed and implemented an Enterprise Planning/Estimating System called Plan.net, which integrated PNNL’s cost estimating, budget, and scheduling departments. Plan.net enabled cost estimating data to be entered into the cost estimating module and automatically update and build the labor, resources, and activities in the budget and schedule modules. Plan.net increased efficiency in Battelle’s planning process, while increasing data traceability and integrity. This system was identified by the Department of Energy as a key reason for Battelle’s earned value management system being approved during their initial review, which had never before occurred. This system is currently being used on most PNNL projects, including the $200+ million Campus of the Future.

PNNL EVMS Interface Development
 Developed by Syner-gistics
 Directly related to Battelle’s EVMS sys-tem being approved by the DOE during initial review

TOP
SAVANNAH RIVER PROTECTIVE FORCES COST ESTIMATE
The Protective Force Security Services contract for Savannah River Site (SRS) is issued by the Department of Energy. This $1contract involves protecting government owned or leased property and material, Category I-IV special nuclear material, classified and sensitive information, vital facilities, support facilities, government and other SRS employees, and visitors to the SRS. The SRS complex covers 310 square miles encompassing parts or Allendale, Aiken, and Barnwell counties in South Carolina, bordering on the Savannah River. The performance of the work requires personnel to be available to respond seven days a week, 24 hours a day.

Synergistics implemented our proven cost estimate development process and system to develop this well documented and defensible cost estimate. Synergistics was responsible for all aspects of cost estimate development, including documentation, training, implementation, and execution of this activity-based cost estimating system. The process provided the basis for price reasonableness and realism for the $1dollar cost estimate. This cost estimate exceeded 900 pages and included company-specific technical approaches to various work breakdown structures requiring detailed estimates, methodology, and basis of estimates. This billion dollar estimate had hundreds of resources with varying labor rates, classifications, and complex burdening structures. The estimate used various cost estimating methods, including parametric, unit cost, and bottoms-up.

Project Value: $1,000,000,000

Savannah River Protective Forces Cost Estimate
 310 Square Miles  887 FTE  900+Pages  >$1 Billion

TOP

CORPORATE EARNED VALUE MANAGEMENT SYSTEM (EVMS DEVELOPMENT AND IMPLEMENTATION)
Synergistics is developing an Earned Value Management System (EVMS) for AECOM Government Services (AGS-AECOM) to achieve compliance with ANSI/EIA-748-A-1989 and the DoD EVMS Implementation Guide, 2006. This effort encompasses the creation and implementation of EVMS-related procedures, tools, and training. Software tools being implemented require integration of cost estimating data from Excel with Primavera P6 schedule management software, Deltek Cobra project cost and earned value management software, Deltek Costpoint financial and accounting data, and Deltek wInsight earned value analysis and reporting software. Synergistics is also revising and updating AECOM corporate documentation including the EVMS System Description and project control procedures covering: Project Organization; Roles and Responsibilities; Work Definition; Work Assignment and Authorization; Estimating Plans and Risk Management; Planning, Scheduling and Budgeting; Data Accumulation, Analysis and Reporting; and Baseline Change Control.

EVMS System Development
 ANSI Compliant  DoD Compiant  Deltek Costpoint  Deltek wInsight  Deltek Cobra  Primavera 6.1

TOP
YUCCA MOUNTAIN REPOSITORY M&O COST ESTIMATE
The Department of Energy Management and Operating Contract for the Yucca Mountain Project is a $2.5dollar contract. USA Repository Services, LLC will provide mission support to the Office of Civilian Radioactive Waste Management (OCRWM) for the Yucca Mountain Project. Key scope activities under this contract are:

Providing management expertise and support for the completion of repository design

Addressing questions or requests for additional information from the U.S. Nuclear Regulatory Commission (NRC) on the DOE’s license application, and supporting DOE’s activities in the subsequent NRC licensing process

Operating the Yucca Mountain Site

Providing construction management and integration support.

Synergistics was responsible for the development of cost estimates for key personnel compensation, including burdened rates, and also assisted in developing labor rate estimation for transition cost estimates. Additionally, Synergistics played a key role on the corporate Green Team review of the cost estimate, project schedule, and risk analysis.

Project Value: $2,500,000,000

Yucca Mountain Repository Management and Operations Cost Estimate
 230 Square Miles  Underground Facilities  10 yrs  $2.5 Billion

TOP

STANFORD LINEAR ACCELERATOR CENTER ENVIRONMENTAL CLEANUP PROJECT
The Department of Energy Stanford Linear Accelerator Center (SLAC) Environmental Cleanup task order is a $13 million contract. The facility occupies 426 acres of Stanford University property that is leased to DOE for research and support operations. The task order requires removal of contaminated soil, disposal in a permitted disposal facility, restoration of excavated areas, obtaining closure certificates, and construction, testing, and startup of a groundwater and soil-vapor treatment system. The primary objective is to restore the work areas to conditions protective of human health and the environment for unrestricted land use.

Synergistics is providing project controls, cost estimating, critical path method scheduling, baseline schedule development, cost and schedule variance analysis, schedule and cost contingencies, control account managers training and assistance, monthly reports, cost schedule performance measurement, and change control services for the project.

Project Value: $13,000,000

SLAC Environmental Cleanup Project
 13 Sites  50,000 Tons  2 Monitor Wells  $13 Million  3 Years

TOP

NATIONAL RENEWABLE ENERGY LABORATORY MANAGEMENT & OPERATIONS CONTRACT COST ESTIMATE
Department of Energy’s (DOE) National Renewable Energy Laboratory (NREL) Management and Operations Contract is a $1.1 billion dollar contract. NREL is the nation’s premier renewable energy and energy efficiency research, development, demonstration, and deployment institution. It is an integral part of DOE’s efforts to develop and deploy renewable energy, energy efficiency, and related technologies and practices and employs 1,200 science and support personnel. The laboratory’s work spans the portfolio of renewable energy and efficiency technologies and is recognized worldwide for its photovoltaic, wind, and biomass research and development contributions.

Synergistics developed the proposal cost estimates for key personnel compensation, including burdened rates, and developed labor rate estimates for transition activities for the NREL Management and Operations Contract. These estimates included basis of estimate documentation to provide accurate and defensible cost estimates.

Project Value: $1,100,000,000

NREL M&O Contract Cost Estimate
Developed Estimates For:
 Key Personnel Com-pensation, including burdened rates
 Transition Costs related to labor rates

TOP
LOGISTICS CIVIL AUGMENTATION PROGRAM CONTRACT (LOGCAP) PROPOSAL
The Logistics Civil Augmentation Program (LOGCAP) is a U.S. Army contract that uses private sector contractors to provide a broad range of logistics and support services to U.S. and allied forces during combat (e.g., missions now under way in Iraq and Afghanistan) and to other contingency, peacekeeping, humanitarian, and training operations. The type of services delivered under LOGCAP include supply operations (e.g., the delivery of food, water, fuel, spare parts, and other items), field operations (e.g., dining, and laundry facilities, housing, sanitation, waste management, postal services, and morale, welfare, and recreation activities), and other operations, including engineering and construction, support to communications networks, transportation and cargo services, and facilities maintenance and repair. The contract is an indefinite quantity/indefinite delivery (ID/IQ) contract with a base year and nine one-year options. Each contract has a maximum value of $5 billion per year, and a lifetime maximum of $150 billion.

Synergistics developed a narrative explaining how an earned value management system (EVMS) would be created and operated in accordance with the American National Standards Institute (ANSI)/Electronic Industries Alliance (EIA) 748-A Standard, which provides a set of best business practices for establishing and applying an integrated management system with coordination of work scope, schedule, and cost objectives and application of earned value methods for program or enterprise planning and control.

Additionally, Synergistics developed the Project Management Plan section of the proposal. This section stated the processes that would be undertaken once a task order was received, to include coordination between contractors and key personnel, augmentation of vital resources, and cooperation with Army and U.S. and foreign government officials; the quality management plan that would be implemented to guarantee excellent performance, and the quality assurance plan.

Project Value: $5,000,000,000

LOGCAP Contract Proposal
 Developed Earned Value Management System narrative and implementation methodology
 Authored Project Management Plan Section

TOP
HANFORD TANK OPERATIONS CONTRACT TRANSITION
The Washington River Protection Solutions (WRPS) Tank Operations Contract is a $7.1 billion contract that includes base operations of the existing tank farms, analytical laboratory support, single-shell tank retrieval and closure, Waste Treatment Plant support, and supplemental treatment of nuclear waste. WRPS will also manage the pension and welfare plans for incumbent and legacy tank farms employees. Hanford’s tank farms contain 53gallons of residual radioactive and chemical waste that resulted from more than three decades of plutonium production. The waste is stored in 177aging underground tanks.

Synergistics supported WRPS during the transition of the Tank Operations Contract, providing programming services to create a computer program to convert an old work breakdown structure (WBS) into a new, more functional version. This conversion was created in Primavera 6.0 and included SQL server procedures and a Visual Basic-created program. This program automatically made the conversion in Primavera using a mapping table.

Synergistics also provided project scheduling support to WRPS during transition. This effort included personnel determining where activities should be created in the project WBS, referencing cost estimation sheets to determine whether resources were properly assigned to activities in the schedule, assigning proper logic ties to the activities to allow for proper cost schedule performance measurement and risk analysis, and printing of schedules to allow for estimate reviews by project managers.

A computer program was also prepared by Synergistics that created an interface between the cost estimate sheets (created in Microsoft Excel) and Primavera 6.0. This program allowed cost data and schedule dates in Primavera to instantly populate cost estimate sheets in Microsoft Excel and also enabled the cost estimate sheets to automatically attach resources to activities created in Primavera without requiring any function from a scheduler.

Project Value: $7,100,000,000

Mission Support Contract Cost Estimate
 586 Square Miles  1,450 Facilities  2600 FTE  2000+ pgs  10 yrs  $3 Billion

TOP
MISSION SUPPORT CONTRACT COST ESTIMATE
The Department of Energy Hanford Mission Support Contract is a $3.1 billion contract to provide cost-effective infrastructure and site services integral and necessary to accomplish the Hanford Site’s environmental cleanup mission. The scope of the MSC contract includes five primary functions: Safety, Security, and Environment; Site Infrastructure and Utilities; Site Business Management; Information Resources/Content Management; and Portfolio Management.

Synergistics was responsible for all aspects of the cost estimate development for the proposal, including documentation, training, implementation, and execution of an activity-based cost estimating system. This process provided the basis for price reasonableness and realism for the $3.1 billion cost estimate. The cost volume exceeded 2,000and included company-specific technical approaches to various work breakdown structures (WBS) requiring detailed activity-based, parametric, and final design cost estimates, and basis of estimates. This billion dollar estimate had hundreds of resources with varying labor rates, classifications, and complex burdening structures. The estimate used several different types of software, including MCACES II (MII), Primavera, Microsoft Access, Excel, and Word.

Project Value: $3,100,000,000

Mission Support Contract Cost Estimate
 586 Square Miles  1,450 Facilities  2600 FTE  2000+ pgs  10 yrs  $3 Billion

TOP

 

.

© synergistics, inc