TANK OPERATIONS CONTRACT COST
ESTIMATE
|
|
The Hanford Tank
Operations Contract (TOC) is a $7.1 billion
contract and is part of the Department of
Energy’s Hanford Central Plateau acquisition
strategy, which calls for three new cleanup
contracts in 2008 at the Site covering mission
support, tank farm operations and closure, and
waste and facility disposition on the Central
Plateau. The scope of the TOC includes base
operations of the tanks, analytical laboratory
support, single-shell tank retrieval and
closure, Waste Treatment Plant support, and
supplemental treatment. Washington River
Protection Solutions also will manage the
pension and welfare plans for incumbent and
legacy tank farms employees. Hanford’s tank
farms contain 53 million gallons of residual
radioactive and chemical waste that resulted
from more than three decades of plutonium
production. The waste is stored in 177 large
aging underground tanks. Synergistics was
responsible for supporting all aspects of cost
estimate development for the proposal, including
documentation, training, implementation, and
execution of an activity-based cost estimating
system. This process provided the basis for
price reasonableness and realism for the $7.1
billion proposal cost estimate. The proposal
cost volume exceeded 3,000 pages and included
company-specific technical approaches to various
work breakdown structures (WBS) requiring
detailed activity-based, parametric, and final
design cost estimates, and basis of estimates.
This billion dollar estimate had hundreds of
resources with varying labor rates,
classifications, and complex burdening
structures. The estimate used several different
types of software, including MCACES II (MII),
Primavera, Microsoft Access, Excel, and Word.
This cost estimating effort demonstrated that
Synergistics has the estimating and programming
capability needed to quickly and efficiently
mass manipulate billions of dollars of
information in MII from a pricing, integration,
and traceability standpoint with the highest
quality of data integrity.
Project Value: $7,100,000,000

Tank Operations Contract Cost Estimate
53
Million Gal-lons Radioactive and Chemical Waste
177 Underground Storage Tanks 1,130 FTE
3000+ Pages 10 Years $7 Billion
TOP |
|
BEST-IN-CLASS, PROJECT
MANAGEMENT CONTRACT
|
|
This project involves providing risk analyses
for the Department of Energy office supporting
oversight of multiple Hanford Site projects
valued at greater than $1 billion. This effort
includes development of risk registers and
models and applying Monte Carlo simulations to
risk models to determine probable lifecycle
schedules and costs at different confidence
intervals. Project contingency is calculated as
part of this effort, and ongoing risk monitoring
and reporting is performed. This work is
performed under subcontract to Project Time &
Cost, Inc. on a task order issued and managed by
the Huntington District U.S. Army Corps of
Engineers in support of the DOE Environmental
Management (EM) Best-in-Class Project Management
effort. Two letters of commendation have been
received in appreciation of the key role
Synergistics has performed to-date on this task.
Additional tasks in support of
this work include reviewing and commenting on
draft DOE-EM headquarters (HQ) guidance
documents related to risk management, and
converting HQ guidance and policy into DOE
Richland Operations Office (DOE-RL) guidance
documents. Synergistics has also worked closely
with Pacific Northwest National Laboratory to
aid in the design of software that assists in
the performance of risk management tasks at DOE-RL.

Best-in-Class, Project Management Contract
Risk Management and
Analysis Contract
Application of risk models on multiple
projects at the DOE Hanford site valued at more
than $1 bil-lion dollars
TOP |
|
PACIFIC NORTHWEST NATIONAL
LABORATORY EARNED VALUE MANAGEMENT SYSTEM
DEVELOPMENT
|
|
Battelle Memorial Institute operates the
Department of Energy’s Pacific Northwest
National Laboratory (PNNL), which is a premier
research and development laboratory with a
strong background in atmospheric science and
global climate change research. Battelle has
operated the laboratory since 1965 and won a
multitude of awards for work performed at the
laboratory. Synergistics
designed and implemented an Enterprise
Planning/Estimating System called Plan.net,
which integrated PNNL’s cost estimating, budget,
and scheduling departments. Plan.net enabled
cost estimating data to be entered into the cost
estimating module and automatically update and
build the labor, resources, and activities in
the budget and schedule modules. Plan.net
increased efficiency in Battelle’s planning
process, while increasing data traceability and
integrity. This system was identified by the
Department of Energy as a key reason for
Battelle’s earned value management system being
approved during their initial review, which had
never before occurred. This system is currently
being used on most PNNL projects, including the
$200+ million Campus of the Future.

PNNL EVMS Interface Development
Developed by
Syner-gistics
Directly related to Battelle’s EVMS sys-tem
being approved by the DOE during initial review
TOP |
|
SAVANNAH RIVER PROTECTIVE
FORCES COST ESTIMATE
|
|
The Protective
Force Security Services contract for Savannah
River Site (SRS) is issued by the Department of
Energy. This $1contract involves protecting
government owned or leased property and
material, Category I-IV special nuclear
material, classified and sensitive information,
vital facilities, support facilities, government
and other SRS employees, and visitors to the
SRS. The SRS complex covers 310 square miles
encompassing parts or Allendale, Aiken, and
Barnwell counties in South Carolina, bordering
on the Savannah River. The performance of the
work requires personnel to be available to
respond seven days a week, 24 hours a day.
Synergistics
implemented our proven cost estimate development
process and system to develop this well
documented and defensible cost estimate.
Synergistics was responsible for all aspects of
cost estimate development, including
documentation, training, implementation, and
execution of this activity-based cost estimating
system. The process provided the basis for price
reasonableness and realism for the $1dollar cost
estimate. This cost estimate exceeded 900 pages
and included company-specific technical
approaches to various work breakdown structures
requiring detailed estimates, methodology, and
basis of estimates. This billion dollar estimate
had hundreds of resources with varying labor
rates, classifications, and complex burdening
structures. The estimate used various cost
estimating methods, including parametric, unit
cost, and bottoms-up.
Project Value:
$1,000,000,000

Savannah River Protective Forces Cost
Estimate
310
Square Miles 887 FTE 900+Pages >$1 Billion
TOP |
|
CORPORATE EARNED VALUE
MANAGEMENT SYSTEM (EVMS DEVELOPMENT AND
IMPLEMENTATION)
|
|
Synergistics is
developing an Earned Value Management System
(EVMS) for AECOM Government Services (AGS-AECOM)
to achieve compliance with ANSI/EIA-748-A-1989
and the DoD EVMS Implementation Guide, 2006.
This effort encompasses the creation and
implementation of EVMS-related procedures,
tools, and training. Software tools being
implemented require integration of cost
estimating data from Excel with Primavera P6
schedule management software, Deltek Cobra
project cost and earned value management
software, Deltek Costpoint financial and
accounting data, and Deltek wInsight earned
value analysis and reporting software.
Synergistics is also revising and updating AECOM
corporate documentation including the EVMS
System Description and project control
procedures covering: Project Organization; Roles
and Responsibilities; Work Definition; Work
Assignment and Authorization; Estimating Plans
and Risk Management; Planning, Scheduling and
Budgeting; Data Accumulation, Analysis and
Reporting; and Baseline Change Control.

EVMS System Development
ANSI Compliant DoD
Compiant Deltek Costpoint Deltek wInsight
Deltek Cobra Primavera 6.1
TOP |
|
YUCCA MOUNTAIN REPOSITORY M&O
COST ESTIMATE
|
|
The Department
of Energy Management and Operating Contract for
the Yucca Mountain Project is a $2.5dollar
contract. USA Repository Services, LLC will
provide mission support to the Office of
Civilian Radioactive Waste Management (OCRWM)
for the Yucca Mountain Project. Key scope
activities under this contract are:
Providing management
expertise and support for the completion
of repository design
Addressing questions
or requests for additional information
from the U.S. Nuclear Regulatory
Commission (NRC) on the DOE’s license
application, and supporting DOE’s
activities in the subsequent NRC
licensing process
Operating the Yucca
Mountain Site
Providing construction
management and integration support.
Synergistics was responsible
for the development of cost estimates for key
personnel compensation, including burdened
rates, and also assisted in developing labor
rate estimation for transition cost estimates.
Additionally, Synergistics played a key role on
the corporate Green Team review of the cost
estimate, project schedule, and risk analysis.
Project Value: $2,500,000,000

Yucca Mountain Repository Management and
Operations Cost Estimate
230 Square Miles
Underground Facilities 10 yrs $2.5 Billion
TOP |
|
STANFORD LINEAR ACCELERATOR
CENTER ENVIRONMENTAL CLEANUP PROJECT
|
|
The
Department of Energy Stanford Linear Accelerator
Center (SLAC) Environmental Cleanup task order
is a $13 million contract. The facility occupies
426 acres of Stanford University property that
is leased to DOE for research and support
operations. The task order requires removal of
contaminated soil, disposal in a permitted
disposal facility, restoration of excavated
areas, obtaining closure certificates, and
construction, testing, and startup of a
groundwater and soil-vapor treatment system. The
primary objective is to restore the work areas
to conditions protective of human health and the
environment for unrestricted land use.
Synergistics is providing project
controls, cost estimating, critical path method
scheduling, baseline schedule development, cost
and schedule variance analysis, schedule and
cost contingencies, control account managers
training and assistance, monthly reports, cost
schedule performance measurement, and change
control services for the project.
Project Value: $13,000,000

SLAC Environmental Cleanup Project
13
Sites 50,000 Tons 2 Monitor Wells $13
Million 3 Years
TOP |
|
NATIONAL RENEWABLE ENERGY
LABORATORY MANAGEMENT & OPERATIONS CONTRACT COST
ESTIMATE
|
|
Department of
Energy’s (DOE) National Renewable Energy
Laboratory (NREL) Management and Operations
Contract is a $1.1 billion dollar contract. NREL
is the nation’s premier renewable energy and
energy efficiency research, development,
demonstration, and deployment institution. It is
an integral part of DOE’s efforts to develop and
deploy renewable energy, energy efficiency, and
related technologies and practices and employs
1,200 science and support personnel. The
laboratory’s work spans the portfolio of
renewable energy and efficiency technologies and
is recognized worldwide for its photovoltaic,
wind, and biomass research and development
contributions.
Synergistics developed the proposal cost
estimates for key personnel compensation,
including burdened rates, and developed labor
rate estimates for transition activities for the
NREL Management and Operations Contract. These
estimates included basis of estimate
documentation to provide accurate and defensible
cost estimates.
Project Value: $1,100,000,000

NREL M&O Contract Cost Estimate
Developed Estimates For:
Key Personnel Com-pensation,
including burdened rates
Transition Costs related to labor rates
TOP |
|
LOGISTICS CIVIL AUGMENTATION
PROGRAM CONTRACT (LOGCAP) PROPOSAL
|
|
The
Logistics Civil Augmentation Program (LOGCAP) is
a U.S. Army contract that uses private sector
contractors to provide a broad range of
logistics and support services to U.S. and
allied forces during combat (e.g., missions now
under way in Iraq and Afghanistan) and to other
contingency, peacekeeping, humanitarian, and
training operations. The type of services
delivered under LOGCAP include supply operations
(e.g., the delivery of food, water, fuel, spare
parts, and other items), field operations (e.g.,
dining, and laundry facilities, housing,
sanitation, waste management, postal services,
and morale, welfare, and recreation activities),
and other operations, including engineering and
construction, support to communications
networks, transportation and cargo services, and
facilities maintenance and repair. The contract
is an indefinite quantity/indefinite delivery
(ID/IQ) contract with a base year and nine
one-year options. Each contract has a maximum
value of $5 billion per year, and a lifetime
maximum of $150 billion.
Synergistics developed a
narrative explaining how an earned value
management system (EVMS) would be created and
operated in accordance with the American
National Standards Institute (ANSI)/Electronic
Industries Alliance (EIA) 748-A Standard, which
provides a set of best business practices for
establishing and applying an integrated
management system with coordination of work
scope, schedule, and cost objectives and
application of earned value methods for program
or enterprise planning and control.
Additionally, Synergistics
developed the Project Management Plan section of
the proposal. This section stated the processes
that would be undertaken once a task order was
received, to include coordination between
contractors and key personnel, augmentation of
vital resources, and cooperation with Army and
U.S. and foreign government officials; the
quality management plan that would be
implemented to guarantee excellent performance,
and the quality assurance plan.
Project Value: $5,000,000,000

LOGCAP Contract Proposal
Developed Earned
Value Management System narrative and
implementation methodology
Authored Project Management Plan Section
TOP |
|
HANFORD TANK OPERATIONS
CONTRACT TRANSITION
|
|
The Washington
River Protection Solutions (WRPS) Tank
Operations Contract is a $7.1 billion contract
that includes base operations of the existing
tank farms, analytical laboratory support,
single-shell tank retrieval and closure, Waste
Treatment Plant support, and supplemental
treatment of nuclear waste. WRPS will also
manage the pension and welfare plans for
incumbent and legacy tank farms employees.
Hanford’s tank farms contain 53gallons of
residual radioactive and chemical waste that
resulted from more than three decades of
plutonium production. The waste is stored in
177aging underground tanks.
Synergistics supported WRPS
during the transition of the Tank Operations
Contract, providing programming services to
create a computer program to convert an old work
breakdown structure (WBS) into a new, more
functional version. This conversion was created
in Primavera 6.0 and included SQL server
procedures and a Visual Basic-created program.
This program automatically made the conversion
in Primavera using a mapping table.
Synergistics also provided
project scheduling support to WRPS during
transition. This effort included personnel
determining where activities should be created
in the project WBS, referencing cost estimation
sheets to determine whether resources were
properly assigned to activities in the schedule,
assigning proper logic ties to the activities to
allow for proper cost schedule performance
measurement and risk analysis, and printing of
schedules to allow for estimate reviews by
project managers.
A computer program was also
prepared by Synergistics that created an
interface between the cost estimate sheets
(created in Microsoft Excel) and Primavera 6.0.
This program allowed cost data and schedule
dates in Primavera to instantly populate cost
estimate sheets in Microsoft Excel and also
enabled the cost estimate sheets to
automatically attach resources to activities
created in Primavera without requiring any
function from a scheduler.
Project Value: $7,100,000,000

Mission Support Contract Cost Estimate
586 Square Miles
1,450 Facilities 2600 FTE 2000+ pgs 10 yrs
$3 Billion
TOP |
|
MISSION SUPPORT CONTRACT COST
ESTIMATE
|
|
The Department of Energy Hanford
Mission Support Contract is a $3.1 billion
contract to provide cost-effective
infrastructure and site services integral and
necessary to accomplish the Hanford Site’s
environmental cleanup mission. The scope of the
MSC contract includes five primary functions:
Safety, Security, and Environment; Site
Infrastructure and Utilities; Site Business
Management; Information Resources/Content
Management; and Portfolio Management.
Synergistics was responsible for
all aspects of the cost estimate development for
the proposal, including documentation, training,
implementation, and execution of an
activity-based cost estimating system. This
process provided the basis for price
reasonableness and realism for the $3.1 billion
cost estimate. The cost volume exceeded 2,000and
included company-specific technical approaches
to various work breakdown structures (WBS)
requiring detailed activity-based, parametric,
and final design cost estimates, and basis of
estimates. This billion dollar estimate had
hundreds of resources with varying labor rates,
classifications, and complex burdening
structures. The estimate used several different
types of software, including MCACES II (MII),
Primavera, Microsoft Access, Excel, and Word.
Project Value: $3,100,000,000

Mission Support Contract Cost Estimate
586
Square Miles 1,450 Facilities 2600 FTE
2000+ pgs 10 yrs $3 Billion
TOP |
|